S-2.1, r. 14 - Regulation respecting occupational health and safety in mines

Full text
236. On a friction hoist a device shall be installed to synchronize the safety devices mentioned in paragraphs 3 and 4 of section 232 and sections 235, 241, 243 and 244 with the position of the conveyance.
O.C. 213-93, s. 236.